The 10% co-financing and cash flow: what a grant really costs

The own contribution is only the first line. VAT, reimbursement one to three months later and durability make the difference. The calculation on a 120,000 euro project and the three sources for the gap.

The 10% co-financing and cash flow: what a grant really costs

"A 200,000 euro grant with 10% co-financing" sounds like you need 20,000 euro. In reality, by the time the first payment arrives from the Managing Authority, your company will have paid out much more. It is not a trap, it is the mechanism, but you should see it in numbers before signing the funding contract. Below is the calculation for a typical 2026 project, with every place where money goes out before it comes in.

Co-financing is only the first line

The basic rule in regional calls: the own contribution is at least 10% of eligible costs, plus all ineligible costs (StartupCafe). This is where the surprises live:

* VAT. For a VAT registered company the tax is not eligible (Zarina CRM). You pay it to suppliers on every invoice and recover it through the usual return, one or more months later.
* What did not make it into the project. Subscriptions after implementation, licences above the cap, equipment removed at evaluation, consultancy above the 5% limit in Centru (ctrl.fund).
* The bonus for a higher contribution. In Centru, an own contribution above 25% brings extra points (StartupCafe). It is a choice, not an obligation, but if you make it, the money is yours from the start.

The money calendar, by stage

A digitalisation project has a long cycle. Evaluation and selection take two to four months, contract signing another one or two, implementation between six and twelve months, and payment arrives one to three months after the transfer request is submitted (Zarina CRM). The final request can only cover costs actually paid during the implementation period, as seen at PNRR, where requests filed after the deadline could no longer be considered (StartupCafe).

Translated into cash flow: you pay suppliers as they deliver, then wait for reimbursement. If you implement in six months and ask for the money at the end, in the simplest scenario you have advanced the entire value of the project.

The example in numbers

Take a project with 120,000 euro of eligible costs, a 90% grant, in a region without a direct payment mechanism:

* Own contribution: 12,000 euro, from the start.
* VAT on invoices: paid to suppliers along the way, recovered through the return, so a peak of a few tens of thousands of euro for one or two months.
* The 108,000 euro grant: advanced by you as you pay the invoices, recovered one to three months after each reimbursement request.

The cash flow peak can reach, in the single request at the end scenario, almost the entire value of the project plus VAT. With two or three intermediate requests, the peak drops to the value of one stage. That is why splitting implementation into stages with separate reimbursement requests is the cheapest "financing" you have available.

The three sources for the difference

1. The payment request, where allowed. The 2021-2027 Regional Programmes provide, next to the reimbursement request, a payment request mechanism through which unpaid invoices can be settled directly by the Managing Authority, with the beneficiary paying the supplier from the money received (ADR Centru). Check in your call's guide whether and under what conditions it is available: it reduces the working capital need to co-financing plus VAT.

2. A pre-financing loan from the bank. Banks have products dedicated to projects under the 2021-2027 Regional Programmes, designed exactly to cover the period between paying the supplier and reimbursement (BCR). It costs interest, but it is plannable, and the signed funding contract is the main guarantee.

3. The mixed model, as at SME Eco-Tech. Some schemes build the loan into the programme's structure: at SME Eco-Tech the grant is at most 40% of the investment and at least 60% is a bank loan from a partner bank (StartupCafe). It is a sign of where things are heading: the grant covers a part, the bank the rest.

The cost that does not appear in the budget: durability

After the final payment, everything you bought must stay in use for the durability period, usually three to five years. Subscriptions, maintenance, hosting and AI models paid per use come from the company's budget (Zarina CRM). Put them in the cash flow plan from the start, otherwise the "free" project becomes a monthly cost you did not budget. We detailed the rule in the article on what you can buy with the grant.

Care with financial data

Cash flow simulations are made on real company figures: balances, due dates, salaries. If you use an AI assistant to build the scenarios, work on rounded, anonymised figures or in a private AI system. Bank statements and trial balances have no place in a public tool, and your bank will ask for the documents through its own channels anyway.

Today's concrete step

Build the table above with your own figures: project value, contribution, VAT, number of reimbursement requests and the month you expect each payment. If the cash flow peak exceeds what you can sustain, talk to the bank before submission, not after contracting. For the technical side of the project and the report at the end, write to us.

Read next

* Preparing your company for a digitalisation call, in 10 steps
* Mistakes that can block your final payment on a digitalisation project
* Digitalisation funding 2026: which calls are open in September

Sources

  1. StartupCafe: The 25 million EUR Bucharest-Ilfov grants are being prepared
  2. Zarina CRM: Funding for SME digitalisation in 2026 and 2027
  3. ctrl.fund: Digital enterprises for an advanced economy, call 2
  4. StartupCafe: SME digitalisation grants 2026 in the Centru region
  5. StartupCafe: PNRR digitalisation grants, payment deadline extended
  6. ADR Centru: Presentation for beneficiaries, payment and reimbursement requests
  7. BCR: Regional Programmes 2021-2027
  8. StartupCafe: SME Eco-Tech webinar
Share

NEWSLETTER · WEEKLY

The week in AI,
distilled.

Every Friday, one short e-mail on what happened in AI and tech, translated into what it means for your business. No jargon, no spam.

  • The news that matters, already filtered
  • One practical tip you can apply on Monday
  • Unsubscribe in one click, anytime

Have a project in mind?

Book a free 30 minute strategy call.

Let's talk